Option D is the preferred site for industrial development in Puslinch with options G and H to be designated as future strategic growth areas. Options A, B and C were ruled out by the township’s hydrogeologist; option F was deemed too small; and option E, which is owned by the Ministry of Transportation, is off the table.
Council zeros in on employment land designation in Puslinch
Previous
Previous
Residents group concerned about Puslinch losing its rural identity
Next
Next

